Solanec, river Hutiský potok, operational profile category C, Surface water

Czech hydrometeorological institute


current status
Mean stage
Tendency : Steady state
river Hutiský potok
gauge Solanec
category C
inclusion Operativní profil
altitude 483.29 a.s.l.
region Zlínský kraj
basin number 4-11-01
municipality Rožnov pod Radhoštěm
gauge operator ČHMÚ Ostrava
sub-basin Morava a přítoky Váhu

Measured data

stage date and time stage [cm] flow [m3.s-1] temperature [°C]
03.04.2026 04:40 21 0.151 4.3
03.04.2026 04:30 20 0.117 4.4
03.04.2026 04:20 20 0.117 4.4
03.04.2026 04:10 20 0.117 4.4
03.04.2026 04:00 20 0.117 4.5
03.04.2026 03:50 21 0.151 4.5
03.04.2026 03:00 20 0.117 4.7
03.04.2026 02:00 21 0.151 4.8
03.04.2026 01:00 21 0.151 5
03.04.2026 00:00 21 0.151 5.2
02.04.2026 23:00 21 0.151 5.3
02.04.2026 22:00 21 0.151 5.5
02.04.2026 21:00 21 0.151 5.7
02.04.2026 20:00 21 0.151 6
02.04.2026 19:00 20 0.117 6.2
02.04.2026 18:00 21 0.151 6.4
02.04.2026 17:00 21 0.151 6.6
02.04.2026 16:00 20 0.117 6.7
02.04.2026 15:00 21 0.151 6.7
02.04.2026 14:00 20 0.117 6.6
02.04.2026 13:00 20 0.117 6.2
02.04.2026 12:00 20 0.117 5.7
02.04.2026 11:00 21 0.151 5.2
02.04.2026 10:00 21 0.151 4.9
02.04.2026 09:00 21 0.151 4.5
02.04.2026 08:00 21 0.151 4.5
02.04.2026 07:00 21 0.151 4.4
02.04.2026 06:00 21 0.151 4.4
02.04.2026 05:00 21 0.151 4.4
02.04.2026 04:00 21 0.151 4.4

Flood warning limits

flood warning levels water stage
Drought 14 cm
Flood watch 50 cm
Flood warning 70 cm
Flooding 90 cm
Extreme flooding 166 cm

Legend - measurement affected

Measurement affected
The measurement is affected by ice phenomena

© Český hydrometeorologický ústav